Scheduled Power Interruption (OCTOBER 21, 2022) between 12:00 NN - 1:00 PM
SCHEDULED POWER INTERRUPTION
Date: OCTOBER 21, 2022 (Friday)
Time: 12:00 NN - 1:00 PM
Duration: 1 Hour
AFFECTED AREA/S:
• UPPER BAYAO Substation
• TIGUMA Substation
• STA. MARIA Substation
• BALANGASAN Substation
• SAN MIGUEL Substation
Municipalities affected:
•PAGADIAN CITY
•LABANGAN
•DUMALINAO
•TIGBAO
•GUIPOS
•SAN PABLO
•SAN MIGUEL
•LAPUYAN
•DIMATALING
•DINAS
•VINCENZO SAGUN
•MARGOSATUBIG
•PITOGO
•TABINA
•Portion of AURORA, ZDS
-Brgy. Lubid
-Brgy. Lantungan
-Brgy. Inroad
-Brgy. Resthouse
•Portion of the municipality of TUKURAN, ZDS
-excluding brgys:
x Navalan
x Laperian
x Buenasuerte
x Sambulawan
Reason/s of Interruption:
1. To correct the phasing/phase sequence of the 10MVA Santa Maria Substation Unit 2 and the new 10MVA Tikwas Substation.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you.
Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160
Download attachments:
- IMG-431eb0c86260ac908bc4bf2ae51007bc-V.jpg (349 Downloads)