Scheduled Power Interruption (May 6, 2023) between 8:00 AM - 5:00 PM
SCHEDULED POWER INTERRUPTION
Date: MAY 6, 2023 (SATURDAY)
Time: 8:00 AM - 5:00 PM
Duration: 9 HOURS
Affected AREAS:
¤Entire Municipality of Vincenzo Sagun
¤Parts of Brgy. Lumbog, Margosatubig
¤Brgy. Limamawan, Margosatubig
Reason of Interruption:
1. ZAMSURECO-I will conduct massive replacement of rotten pole insertions to correct vertical clearance and clearing of powerline in preparation for backbone line conversion from vee- phase to 3-phase and primary reconductoring from 1/0 to 4/0.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you
Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160
Download attachments:
- IMG-431eb0c86260ac908bc4bf2ae51007bc-V.jpg (318 Downloads)