Schedule Power Interruption (JULY 22, 2023) between 8:00 AM - 5:00 PM
SCHEDULE POWER INTERRUPTION
Date: JULY 22, 2023 (SATURDAY)
Time: 8:00 AM - 5:00 PM
Duration: 9 HOURS
Affected Areas:
•Entire Municipality of Vinzenzu Sagun
•Parts of Brgy. Lumbog, Margosatubig
•Brgy. Limamawan, Margosatubig
Reason/s of Interruption:
1. ZAMSURECO-I WILL CONDUCT LINE CONVERSATION FROM VEE-PHASE TO 3-PHASE AND PRIMARY RECONDUCTORING FROM #2 TO 4/0 FROM C8 KATIPUNAN TO C8 COGON, V-SAGUN.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the schedules works. Please take the necessary preparations and precautions in anticipation of this schedule power interruption.
Thank you.
Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160
Download attachments:
- IMG-431eb0c86260ac908bc4bf2ae51007bc-V.jpg (311 Downloads)