SCHEDULE POWER INTERRUPTION (NOVEMBER 10, 2023) between 9:00 AM - 5:00 PM
SCHEDULE POWER INTERRUPTION
Date: NOVEMBER 10, 2023 (FRIDAY)
Time: 9:00 AM - 5:00 PM
Duration: 8 HOURS
Affected area/s:
>MAHAYAG ZDS.
*Portion of Brgy. San Vicente
*Brgy. Dalaguete
*Brgy. Delusom
*Brgy. Panagaan
*Brgy. Malubo
*Brgy. Tulan
>JOSEFINA ZDS.
*Brgy. Mansanas
*Brgy. Litapan
*Brgy.Nemeno
*Brgy. Tagaytay
*Brgy. Moradji
*Brgy.Dawa
*Brgy. Gumahan
*Brgy. Upper Bag-Ong Tudela
*Brgy.Leonardo
*Brgy. Napulan
*Brgy. Sebokang
*Brgy. Bogo Calabat.
>MOLAVE ZDS.
*Brgy. Bag-Ong Argao
*Brgy. Lower Dimorok
*Brgy. Upper Dimorok
*Brgy. Simata
*Brgy. Alicia
*Brgy. Silangit
*Brgy. Santo Rosario
*Brgy. Bag-Ong Ariosa
*Brgy. Bag-Ong Gutlang
>TAMBULIG ZDS.
*Brgy. Maya-Maya
>DON VICTORIANO
*Brgy. Lampasan
*Brgy. Tuno
*Brgy. Lalud
*Brgy. Napangan
*Brgy, Bag-Ong Clarin
*Brgy. Petianan
*Brgy. Mara-Mara
Reason/s of Interruption:
1. Relocation of Poles due to road widening and prepation for re-conductoring from Delusom to Panagaan, Mahayag, ZDS
2. Massive replacement of Porcelain to Polymer Pin type Insulators.
3. Clearing and cutting of trees along the affected Powerlines.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you
Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160
Download attachments:
- IMG-431eb0c86260ac908bc4bf2ae51007bc-V.jpg (223 Downloads)