SCHEDULE POWER INTERRUPTION (NOVEMBER 22, 2023) between 9:00 AM - 5:00 PM
SCHEDULE POWER INTERRUPTION
Date: NOVEMBER 22, 2023 (WEDNESDAY)
Time: 9:00 AM - 5:00 PM
Duration: 8 HOURS
Affected area/s:
>MUNICIPALITY OF AURORA:
*Libertad
*Maguikay
*Alegria
*Bemposa
*Waterfall
*Bag-ong Pitogo
*San Juan
*La Victoria
*Commonwealth
*Baki
*Kahayagan East
*Kahayagan West
*Bag-ong Mandue
*Panaghiusa
*Monte Alegre
*Balintawak
*Montela
*Campo 1
*Sapa Loboc
*Kauswagan
*Mahayahay
*Portion of San Jose
*Portion of Gubaan
*Inasagan
Reason/s of Interruption:
1. UPGRADING OF CONDUCTOR FROM 1/0 TO 4/0 AND REPLACEMENT OF SMALL INSULATORS TO POLYMER AT SAN JOSE, AURORA ZDS.
2. CONVERSION OF C1 TO C8 STRUCTURE AT SAN JOSE AURORA ZDS.
3.CLEARING OF POWER LINE ALONG AFFECTED AREAS.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you
Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160
Download attachments:
- IMG-431eb0c86260ac908bc4bf2ae51007bc-V.jpg (208 Downloads)