NGCP SCHEDULE POWER INTERRUPTION (NOVEMBER 24, 2023) between 6:00 AM TO 6:00 PM
NGCP SCHEDULE POWER INTERRUPTION
Date: NOVEMBER 24, 2023 (FRIDAY)
Time: 6:00 AM - 6:00PM
Duration: 12 HOURS
Affected area/s:
• UPPER BAYAO Substation
• TIGUMA Substation
• STA. MARIA Substation
• BALANGASAN Substation
• TIKWAS Substation
• SAN MIGUEL Substation
Municipalities affected:
•PAGADIAN CITY
•LABANGAN
•DUMALINAO
•TIGBAO
•GUIPOS
•SAN PABLO
•SAN MIGUEL
•LAPUYAN
•DIMATALING
•DINAS
•VINCENZO SAGUN
•MARGOSATUBIG
•PITOGO
•TABINA
•TUKURAN
-excluding brgys:
x Navalan
x Laperian
x Buenasuerte
x Sambulawan
•Portion of AURORA, ZDS
-Brgy. Lubid
-Brgy. Lantungan
-Brgy. Inroad
-Brgy. Resthouse
Reason/s of Interruption:
1. NGCP will facilitate the request of cooperative to ensure personnel safety during transformer delivery and placement at their Balangasan and Tiguma Substation.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you.