Scheduled Power Interruption (June 24, 2022)
SCHEDULED POWER INTERRUPTION
When: JUNE 24, 2022 (FRIDAY)
Time: 9:00 AM - 4:00 PM
Duration: 7 Hours
Affected area/s:
TAMBULIG FEEDER:
PORTION OF MUN. OF TAMBULIG, ZDS:
• Brgy. Lower Usugan
• Brgy. San Jose
• Brgy. Cabgan
• Brgy. Sumalig
• Brgy. Angeles
• Portion of Brgy. Balucot
Reason/s of Interruption:
1. Replacement of the following rotten wood poles:
a. B1 Structure - 4 pcs.
b. B2 Structure - 1 pc.
c. B3 Structure - 1 pc.
2. Clearing on affected power line.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you.
Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160
Download attachments:
- IMG-431eb0c86260ac908bc4bf2ae51007bc-V.jpg (377 Downloads)