NGCP Scheduled Power Interruption (February 18, 2023) between 8:00 AM - 8:30 AM
NGCP SCHEDULED POWER INTERRUPTION
Date: February 18, 2023 (SATURDAY)
Time: 8:00 AM - 8:30 AM
Duration: 30 Minutes
Affected area/s:
• UPPER BAYAO Substation
• TIGUMA Substation
• STA. MARIA Substation
• BALANGASAN Substation
• TIKWAS Substation
• SAN MIGUEL Substation
Municipalities affected:
•PAGADIAN CITY
•LABANGAN
•DUMALINAO
•TIGBAO
•GUIPOS
•SAN PABLO
•SAN MIGUEL
•LAPUYAN
•DIMATALING
•DINAS
•VINCENZO SAGUN
•MARGOSATUBIG
•PITOGO
•TABINA
•Portion of AURORA, ZDS
-Brgy. Lubid
-Brgy. Lantungan
-Brgy. Inroad
-Brgy. Resthouse
•Portion of the municipality of TUKURAN, ZDS
-excluding brgys:
x Navalan
x Laperian
x Buenasuerte
x Sambulawan
Reason/s of Interruption:
1. NGCP will conduct Brief interruption to facilitate the opening of the 69KV bus Tie DS at Aurora Substation for the implementation of paralleling of the 100MVA T1 Alstom Transformer and 100MVA T3 ABB Transformer.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you.