Please bear with us. The site is still undergoing maintenance and enhancement procedures.

Announcement

Wednesday, 28 December 2022
NGCP SCHEDULED POWER INTERRUPTION Date: DECEMBER 29, 2022 (THURSDAY) Time: 10:00 AM - 2:00 PM Duration: 4 Hours Affected area/s: • UPPER BAYAO Substation • TIGUMA Substation • STA. MARIA Substation • BALANGASAN Substation • SAN MIGUEL Substation   Municipalities affected: •PAGADIAN CITY •LABANGAN •DUMALINAO •TIGBAO •GUIPOS •SAN PABLO •SAN MIGUEL •LAPUYAN •DIMATALING •DINAS •VINCENZO SAGUN •MARGOSATUBIG •PITOGO •TABINA •Portion of AURORA, ZDS -Brgy. Lubid -Brgy. Lantungan -Brgy. Inroad -Brgy. Resthouse •Portion of the municipality of TUKURAN, ZDS -excluding brgys: x Navalan x Laperian x Buenasuerte x Sambulawan   Reason/s of Interruption: 1. NGCP will conduct Manual Load Dropping (MLD) as contigency measure to avoid overloading the remaining line during the transfer of conductors from temporary ERS structure to the newly erected permanent structure no.8 of the Baloi-Aurora 138kV TL located at Sitio San Isidro, Brgy. BagongBayan, Kauswagan, Lanao del Norte.   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.   Thank you.      
Published in Power Advisories
NGCP SCHEDULED POWER INTERRUPTION Date: DECEMBER 29, 2022 (Thursday) Time: 8:00 AM - 11:00 AM Duration: 3 Hours Affected area/s: • SWITCH Substation • CULO Substation • SAN JOSE Substation   MUNICIPALITIES OF ZDS: • RAMON MAGSAYSAY • DUMINGAG • TAMBULIG • SOMINOT • JOSEFINA • MOLAVE • MIDSALIP • MAHAYAG • AURORA (Excluding Brgys: Lubid, Lantungan, Inroad, and Resthouse) • Portion of Municipality of TUKURAN (Brgys: Navalan, Sambulawan, Buenasuerte, and Laperian) MUNICIPALITY OF MISAMIS OCCIDENTAL • Entire Municipality of DON VICTORIANO, Misamis Occidental   Reason/s of Interruption: 1. NGCP will conduct Manual Load Dropping (MLD) as contigency measure to avoid overloading the remaining line during the transfer of conductors from temporary ERS structure to the newly erected permanent structure no.8 of the Baloi-Aurora 138kV TL located at Sitio San Isidro, Brgy. BagongBayan, Kauswagan, Lanao del Norte.   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption. Thank you.        
Published in Power Advisories