SCHEDULED POWER INTERRUPTION Date: MARCH 24, 2023 (FRIDAY) Time: 9:00 AM - 5:00 PM Duration: 8 Hours Affected Substation/S: • CULO substation   affected entire municipalities: • MOLAVE • MAHAYAG • JOSEFINA • DUMINGAG • DON VICTORIANO • SOMINOT (BRGY. LANTAWAN AND NEW OROQUITA PORTION OF TAMBULIG: • BRGY. PELOCUBAN • BRGY. BAG-ONG KAUSWAGAN • BRGY. LIBATO • BAG-ONG TABUGON • BRGY. LOWER LIASON • BRGY. UPPER LIASON AND BRGY. UPPER DIMALINAO   Reason/s of Interruption: 1. TO CORRECT HOTSPOT DETECTED DURING AUDIT INSPECTION 2. MOLAVE FEEDER LINE MAINTENANCE RIDE ON ACTIVITY: A. TRANSFER RUDHIL 3 PHASE CONNECTION TO DC1 STRUCTURE AND PULL OUT ALMOST COLLAPSE POLE B. TRANSFER OF PMC 3 PHASE CONNECTION TO DC1 STRUCTURE. C. RELOCATE DC1 STRUCTURE (CONSUMER COMPLAINT) D. CLEARING ALONG AFFECTED POWER LINE. 3. MAHAYAG FEEDER LINE MAINTENANCE RIDEO N ACTIVITY: A. REPLACEMENT OF ROTTEN POLE C8 & C1 STRUCTURE AT LOWER LANDING DUMINGAG. B. REPLACEMENT OF ROTTEN CROSSARM OF C1 STRUCTURE AT SAN PEDRO DUMINGAG. C. HOTSPOT CORRECTION AT C8 SAN ISIDRO MAHAYAG (RECONDUCTOR OF C8 JUMPER) D. CLEARING ALONG AFFECTED POWER LINE.   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption. Thank you
Published in Power Advisories
SCHEDULED POWER INTERRUPTION Date: MARCH 21, 2023 (TUESDAY) Time: 9:00 AM - 5:00 PM Duration: 8 Hours Affected Feeder: • Lenienza Feeder   Affected area/s: • BRGY. LENIENZA MAJORITY OF BARANGAY MANGA EXCEPT VETTALE HIGHLAND HOMES; LUMINA HOMES PAGADIAN; AND PORTION OF BARANGAY TIGUMA PARTICULARLY IN SUNRISE VILLAGE AND ALTA TIERRA, TIGUMA.   Reason/s of Interruption: 1. TO FACILITATE THE REPLACEMENT OF 5 DILAPIDATED WOOD POLES OF BACKBONE LINE IN BARANGAYS OF LENIENZA AND MANGA; 2. INSERT C2 STRUCTURE FOR TRANSFER OF TAPPING POLE FOR PUROK 9, MANGA, PAGADIAN CITY; 3. CONSTRUCTION OF POLE TOP ASSEMBLY FOR RELOCATION OF 5 POLES AFFECTED BY FARM TO MARKET ROAD PROJECT OF DPW; 4. REPLACEMENT FOF OLD PORCELAIN INSULATORS TO POLYMER INSULATORS; 5.CLEARING THE OBSTRUCTION OF POWER LINES SUCH AS TALL GROWING TREES AND VEGETATIONS.   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption. Thank you
Published in Power Advisories