NGCP Scheduled Power Interruption (OCTOBER 15, 2022) between 12:00 PM - 2:00 PM
NGCP SCHEDULED POWER INTERRUPTION Date: OCTOBER 15, 2022 (Saturday) Time: 12:00 PM - 2:00 PM Duration: 2 Hours Affected area/s: • UPPER BAYAO Substation • TIGUMA Substation • STA. MARIA Substation • BALANGASAN Substation • SAN MIGUEL Substation Municipalities affected: •PAGADIAN CITY •LABANGAN •DUMALINAO •TIGBAO •GUIPOS •SAN PABLO •SAN MIGUEL •LAPUYAN •DIMATALING •DINAS •VINCENZO SAGUN •MARGOSATUBIG •PITOGO •TABINA •Portion of AURORA, ZDS -Brgy. Lubid -Brgy. Lantungan -Brgy. Inroad -Brgy. Resthouse •Portion of the municipality of TUKURAN, ZDS -excluding brgys: x Navalan x Laperian x Buenasuerte x Sambulawan Reason/s of Interruption: 1. NGCP will conduct Manual Load Dropping as a contingency measure to avoid overloading the remaining 138kV line during the shutdown of Baloi-Agus 5 138kV line for the upgrading of protection relays at Baloi and Agus 5 substation. As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption. Thank you.        
Oct 11th , 2022 Read More
NGCP Scheduled Power Interruption (OCTOBER 15, 2022) between 6:00 AM-4 PM
NGCP EMERGENCY POWER INTERRUPTION Date: OCTOBER 15, 2022 (Saturday) Time: 6:00 AM - 4:00 PM Duration: 10 HOURS Affected areas of: • SWITCH Substation • CULO Substation • SAN JOSE Substation MUNICIPALITIES OF ZDS: • RAMON MAGSAYSAY • DUMINGAG • TAMBULIG • SOMINOT • JOSEFINA • MOLAVE • MIDSALIP • MAHAYAG • AURORA (Excluding Brgys: Lubid, Lantungan, Inroad, and Resthouse) • Portion of Municipality of TUKURAN (Brgys: Navalan, Sambulawan, Buenasuerte, and Laperian) MUNICIPALITY OF MISAMIS OCCIDENTAL • Entire Municipality of DON VICTORIANO, Misamis Occidental Reason/s of Interruption: 1. NGCP will conduct Transmission Line Maintenance along Aurora-Magangon 69kV Line. As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption. Thank you.
Oct 11th , 2022 Read More
Unified Sitio Electrification (USE) Database Workshop
USE DATABASE The National Electrification Administration is conducting the Unified Sitio Electrification (USE) Database Workshop in Region IX, hosted by RENECA, on October 19-20, 2022 at ZAMSURECO-I Heroe's Hall, Pagadian City. The workshop is attended by Region IX member electric cooperatives namely; ZANECO, ZAMCELCO, ZAMSURECO-I, and ZAMSURECO-II. RENECA President, GM/CEO Jose Raul A. Saniel in his welcome message acknowledges the presence of NEA headed by Database Management and Program Control Division Manager Ms. Leilani L. Rico and all participants. ZAMSURECO-I personnel rendered a welcome dance presentation to energize the participants.
Nov 19th , 2022 Read More
LAUNCHING OF TUKURAN BAYAD CENTER AND NEWLY RENOVATED CENTRAL OFFICE TELLERING OFFICE
ZAMSURECO-I has imbibed strategic initiatives in delivering quality services and customer experience as it launched its 6th coop-owned Bayad and Action Center since the pandemic. "Today, 18th October 2022 ZAMSURECO-I has realized its vision of reaching out and bringing its services closer to the people as it opens its Tukuran Bayad and Action Center, Under the leadership of General Manager and CEO JOSE RAUL A. SANIEL, ZAMSURECO-I is committed to implementing and establishing development programs that answer the needs of its valued member-consumer owners. The project is funded by the efficiency gains availed by ZAMSURECO-I specifically on the Collection Efficiency Incentive by sustaining a high collection efficiency performance, from its power suppliers and partners. With this, the cooperative is extending gratitude and recognizing all the combined efforts and contributions among its officers, employees, and stakeholders who are directly involved in the realization of a commitment that significantly creates an impact on the community. ZAMSURECO-I’s present innovative platform and connectivity, provide its MCOs fast access to services within the franchise area including online bill payment, processing electric service applications and energization, and action to electricity-related customer complaints, among others. To provide more convenience and decent space for the paying customers, on the same day, at 3:00 pm, a blessing ceremony is successfully conducted for the newly renovated ZAMSURECO-I Tellering Office at the Central Office Building, Pagadian City. Gracing the event are Rev. Fr. Oliver Janohan, GM/CEO Jose Raul A. Saniel, Board of Directors, MCO Officers of District V and IX, Mr. Rico Salvacion and Legaspi Cabatcha, respectively, NEA team headed by Database Management and Program Control Division Manager Ms. Leilani Rico, ZAMSURECO-I personnel and media partners. Up next, we are extremely excited to commission another capacity project – the 10 MVA Substation in Tikwas, Dumalinao this October 2022. Rest assured that ZAMSURECO-I will continue to deliver delight to its member-consumer owners and other stakeholders. CONGRATULATIONS!        
Oct 19th , 2022 Read More
MANUAL LOAD DROPPING SCHEDULE (NOVEMBER 23, 2022)
SCHEDULED NGCP POWER INTERRUPTION UPDATE: NGCP Revise Manual Load Dropping (MLD) Matrix Schedule for November 23, 2022 on Aurora-San Miguel 69kv Line under 10 megawatt Voluntary Load Curtailment   Time Schedule: •2:00PM - 4:00PM   Affected area/s: • UPPER BAYAO Substation • TIGUMA Substation • STA. MARIA Substation • BALANGASAN Substation • SAN MIGUEL Substation Municipalities affected: •PAGADIAN CITY •LABANGAN •DUMALINAO •TIGBAO •GUIPOS •SAN PABLO •SAN MIGUEL •LAPUYAN •DIMATALING •DINAS •VINCENZO SAGUN •MARGOSATUBIG •PITOGO •TABINA •Portion of AURORA, ZDS -Brgy. Lubid -Brgy. Lantungan -Brgy. Inroad -Brgy. Resthouse •Portion of the municipality of TUKURAN, ZDS -excluding brgys: x Navalan x Laperian x Buenasuerte x Sambulawan NGCP will implement Manual Load Dropping (MLD) to all power customers of District 1, Mindanao O&M to temporarily limit power flow along Baloi-Aurora and Agus 5–Aurora 138kV lines to prevent breaching the safe clearance of the conductors from overgrown vegetation at Brgy. Tingin-tingin, Kauswagan, Lanao del Norte due to an uncooperative landowner refusing access to NGCP personnel to clear the vegetation. NOTE: This is just temporary and will be changed once the NGCP transmission line is restored to its normal operating condition. Thank you.
Nov 21st , 2022 Read More
MANUAL LOAD DROPPING SCHEDULE (NOVEMBER 20, 2022)
SCHEDULED NGCP POWER INTERRUPTION UPDATE: NGCP Revise Manual Load Dropping (MLD) Matrix Schedule for November 20, 2022 on Aurora-San Miguel 69kv Line  Time Schedule: •12:00 AM - 1:00 AM •8:00 AM - 12:00 PM Affected area/s: • UPPER BAYAO Substation • TIGUMA Substation • STA. MARIA Substation • BALANGASAN Substation • SAN MIGUEL Substation Municipalities affected: •PAGADIAN CITY •LABANGAN •DUMALINAO •TIGBAO •GUIPOS •SAN PABLO •SAN MIGUEL •LAPUYAN •DIMATALING •DINAS •VINCENZO SAGUN •MARGOSATUBIG •PITOGO •TABINA •Portion of AURORA, ZDS   -Brgy. Lubid   -Brgy. Lantungan   -Brgy. Inroad   -Brgy. Resthouse •Portion of the municipality of TUKURAN, ZDS   -excluding brgys:     x Navalan    x Laperian    x Buenasuerte    x Sambulawan NGCP will implement Manual Load Dropping (MLD) to all power customers of District 1, Mindanao O&M to temporarily limit power flow along Baloi-Aurora and Agus 5–Aurora 138kV lines to prevent breaching the safe clearance of the conductors from overgrown vegetation at Brgy. Tingin-tingin, Kauswagan, Lanao del Norte due to an uncooperative landowner refusing access to NGCP personnel to clear the vegetation. NOTE: This is just temporary and will be changed once the NGCP transmission line is restored to its normal operating condition. Thank you.
Nov 19th , 2022 Read More
MANUAL LOAD DROPPING SCHEDULE (NOVEMBER 21, 2022)
SCHEDULED NGCP POWER INTERRUPTION UPDATE:   NGCP Revise Manual Load Dropping (MLD) Matrix Schedule for November 21, 2022 on Aurora-San Miguel 69kv Line    Time Schedule: •8:01 AM - 10:00 AM •1:01 PM - 3:00 PM •5:01 PM - 8:00 PM °10:01 PM - 12:00 AM   Affected area/s: • UPPER BAYAO Substation • TIGUMA Substation • STA. MARIA Substation • BALANGASAN Substation • SAN MIGUEL Substation Municipalities affected: •PAGADIAN CITY •LABANGAN •DUMALINAO •TIGBAO •GUIPOS •SAN PABLO •SAN MIGUEL •LAPUYAN •DIMATALING •DINAS •VINCENZO SAGUN •MARGOSATUBIG •PITOGO •TABINA •Portion of AURORA, ZDS   -Brgy. Lubid   -Brgy. Lantungan   -Brgy. Inroad   -Brgy. Resthouse •Portion of the municipality of TUKURAN, ZDS   -excluding brgys:     x Navalan    x Laperian    x Buenasuerte    x Sambulawan NGCP will implement Manual Load Dropping (MLD) to all power customers of District 1, Mindanao O&M to temporarily limit power flow along Baloi-Aurora and Agus 5–Aurora 138kV lines to prevent breaching the safe clearance of the conductors from overgrown vegetation at Brgy. Tingin-tingin, Kauswagan, Lanao del Norte due to an uncooperative landowner refusing access to NGCP personnel to clear the vegetation. NOTE: This is just temporary and will be changed once the NGCP transmission line is restored to its normal operating condition. Thank you.
Nov 20th , 2022 Read More
MANUAL LOAD DROPPING SCHEDULE (NOVEMBER 22, 2022)
SCHEDULED NGCP POWER INTERRUPTION UPDATE:   NGCP Revised Manual Load Dropping (MLD) Matrix Schedule for November 22, 2022 on Aurora-Magangon 69kv Line    ?Time Schedule: ?4:01 AM - 6:00 AM ?3:01 PM - 5:00 PM   ?Affected area/s: • SWITCH Substation  • CULO Substation • SAN JOSE Substation   MUNICIPALITIES OF ZDS: • RAMON MAGSAYSAY  • DUMINGAG  • TAMBULIG  • SOMINOT  • JOSEFINA  • MOLAVE • MIDSALIP      • MAHAYAG  • AURORA (Excluding Brgys: Lubid, Lantungan, Inroad, and Resthouse) • Portion of Municipality of TUKURAN    (Brgys: Navalan, Sambulawan, Buenasuerte, and Laperian) MUNICIPALITY OF MISAMIS OCCIDENTAL  • Entire Municipality of DON VICTORIANO, Misamis Occidental   NGCP will implement Manual Load Dropping (MLD) to all power customers of District 1, Mindanao O&M to temporarily limit power flow along Baloi-Aurora and Agus 5–Aurora 138kV lines to prevent breaching the safe clearance of the conductors from overgrown vegetation at Brgy. Tingin-tingin, Kauswagan, Lanao del Norte due to an uncooperative landowner refusing access to NGCP personnel to clear the vegetation.   NOTE: This is just temporary and will be changed once the NGCP transmission line is restored to its normal operating condition. Thank you.
Nov 21st , 2022 Read More