SCHEDULE POWER INTERRUPTION (SEPTEMBER 12, 2023) between 9:00 AM - 5:00 PM
SCHEDULE POWER INTERRUPTION
Date: SEPTEMBER 12, 2023 (TUESDAY)
Time: 9:00 AM - 5:00 PM
Duration: 8 HOURS
Affected area/s:
* Dinas Municipal Hall
*Police and Fire Station
*Engineering
*MPDC and other LGU offices
*Purok Quarry, Benuatan, Dinas ZDS
Reason/s of Interruption:
1. Replacement of Deteriorated Service drop Wire from tapping pole to house service entrance 21 connections with the total 22000 meters.
2. Transfer Kwh meters to a new platform.
3. Pulling out of old Service drop wire and keeping it for salvage materials.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you.
Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160
Download attachments:
- IMG-431eb0c86260ac908bc4bf2ae51007bc-V.jpg (243 Downloads)