SCHEDULE POWER INTERRUPTION (January 24, 2024) between 9:00 AM - 4:00 PM
SCHEDULE POWER INTERRUPTION
Date: JANUARY 24, 2024 (WEDNESDAY)
Time: 9:00 AM - 4:00 PM
Duration: 7 HOURS
Affected area/s:
>line section serving along b. aquino street from corner cabrera street of barangay gatas to corner sabate street of barangay san jose district pagadian city.
Reason/s of Interruption:
1. Conversion of VEE Phase primary line to three (3)phase to upgrade POWERLINE CAPACITY, RECONDUCTORING FROM 1/0 TO 4/0 BARE WIRE CONDUCTOR, REPLACEMENT OF DILAPIDATED POLE OF ESMERALDA A. SAN JOSE PAGADIAN CITY. AND CORRECTION OF SAG WIRE, VEGETATION CLEARING AT PUROK SANTAN SAN JOSE PAGADIAN CITY.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you
Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160
Download attachments:
- IMG-431eb0c86260ac908bc4bf2ae51007bc-V.jpg (142 Downloads)