NGCP UNSCHEDULE POWER INTERRUPTION (JUNE 19, 2024) between 7:28 AM - 7:33AM
NGCP SCHEDULE POWER INTERRUPTION
Date: JUNE 19, 2024 (WEDNESDAY)
Time Trip: 7:28 AM
Time Restored: 7:33 AM
Affected area/s:
• UPPER BAYAO Substation
• TIGUMA Substation
• STA. MARIA Substation
• BALANGASAN Substation
• SAN MIGUEL Substation
Municipalities affected:
•PAGADIAN CITY
•LABANGAN
•DUMALINAO
•TIGBAO
•GUIPOS
•SAN PABLO
•SAN MIGUEL
•LAPUYAN
•DIMATALING
•DINAS
•VINCENZO SAGUN
•MARGOSATUBIG
•PITOGO
•TABINA
•Portion of AURORA, ZDS
-Brgy. Lubid
-Brgy. Lantungan
-Brgy. Inroad
-Brgy. Resthouse
•Portion of the municipality of TUKURAN, ZDS
-excluding brgys:
x Navalan
x Laperian
x Buenasuerte
x Sambulawan
Root Cause:
*Relay Indication: AN, Fault Location: 45.37 kms
(A flown coco palm fell towards the phase A conductor between Struction Nos. 197 & 198 along Aurora- San Miguel 69kv line located at Betinan, San Miguel.
We Apologize for this inconvenience.
Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160