SCHEDULE POWER INTERRUPTION APRIL 23, 2025) between 9:00 AM - 5:00 PM
SCHEDULE POWER INTERRUPTION
Date: APRIL 23, 2025 (WEDNESDAY)
Time: 9:00 AM - 5:00 PM
Duration: 8Hours
Affected AREAS:
>DUBAO (Dumalinao and Tigbao) Feeder
ENTIRE BARANGAY OF:
*Paglaum
*Upper Dumalinao
*Tina
*Calingayan
*Cuatro-Cuatro
*Baga
*Mecolong
*Matab-ang
*Pantad
*San Agustin
*Rebokon
*Mama
*Metokong
*Bibilik
*Bagong Misamis Dumalinao
*Bagong Misamis San Pablo
Reason of Interruption:
1. Clearing of vegetation along powerlines.
2. Replacement of leaking insulator.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you
Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160