Scheduled Power Interruption (June 25, 2020)
SCHEDULED POWER INTERRUPTION
When: JUNE 25, 2020 THURSDAYTime: 9:00AM - 5:00PM
Reason/s of Interruption:
1. To conduct rotten pole replacement
2. To conduct replacement of suspected leaked insulators
3. Clearing of power lines along the affected area and preparation for the reconductoring of Tabina Three-Phase Backbone Line.
Affected areas of:
• Entire Municipality of TABINA
PITOGO
• Barangay Upper Panikian
• Barangay Tongao
• Barangay Punta Fletcha
• Barangay Limbayan
Power will be restored without prior notice as soon as the maintenance works are completed. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you.
Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160