Please bear with us. The site is still undergoing maintenance and enhancement procedures.

ZAMSURECO-I

Power Advisories

Monday, 21 October 2024
SCHEDULE POWER INTERRUPTION Date: OCTOBER 22, 2024 (TUESDAY) Time: 8:00 AM- 5:00 PM Duration: 9 Hours Affected Areas: *Portion of Guipos (Barangay Lower Canunan & Guling) *Entire Municipality of San Pablo >including Barangay Tubo-Pait, Dumalinao >Except Barangay Bagong Misamis and Purok Riverside, Payag Reason/s of Interruption: A. ZAMSURECO-I will conduct a replacement of 12 rotten poles (which include 7 pole structures conversion), 5 rotten crossarm and clearing of power lines (approximately 2.120 circuit kms) at barangay payag to barangay mabuhay, San Pablo ZDS. as phase 7 in preparation for the rehabilitation and conversion of the San Pablo Backbone Line from Vee Phase to Three Phase Primary Line and Reconductoring of Primary Conductors from 2/0 All Aluminum Bare Wire ACSR to 4/0 All Aluminum Bare wire ACSR. As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption. Thank you.    
Published in Power Advisories