Please bear with us. The site is still undergoing maintenance and enhancement procedures.

ZAMSURECO-I

Power Advisories

Thursday, 14 November 2024
NGCP SCHEDULE POWER INTERRUPTION Date: NOVEMBER 17, 2024 (SUNDAY) Time: 12:00 NN - 12:30 PM DURATION: 30 Minutes   Affected area/s: • UPPER BAYAO Substation • TIGUMA Substation • STA. MARIA Substation • BALANGASAN Substation • SAN MIGUEL Substation Municipalities affected: •ENTIRE PAGADIAN CITY •LABANGAN •DUMALINAO •TIGBAO •GUIPOS •SAN PABLO •SAN MIGUEL •LAPUYAN •DIMATALING •DINAS •VINCENZO SAGUN •MARGOSATUBIG •PITOGO •TABINA •Portion of AURORA, ZDS -Brgy. Lubid -Brgy. Lantungan -Brgy. Inroad -Brgy. Resthouse •Portion of the municipality of TUKURAN, ZDS -excluding brgys: x Navalan x Laperian x Buenasuerte x Sambulawan Reason/s of Interruption: *NGCP will conduct brief power interruption for load normalization back to the 100MVA TBEA T2. As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption. Thank you.  
Published in Power Advisories
NGCP SCHEDULE POWER INTERRUPTION Date: NOVEMBER 17, 2024 (SUNDAY) Time: 9:00 AM - 9:30 AM DURATION: 30 Minutes   Affected area/s: • UPPER BAYAO Substation • TIGUMA Substation • STA. MARIA Substation • BALANGASAN Substation • SAN MIGUEL Substation Municipalities affected: •ENTIRE PAGADIAN CITY •LABANGAN •DUMALINAO •TIGBAO •GUIPOS •SAN PABLO •SAN MIGUEL •LAPUYAN •DIMATALING •DINAS •VINCENZO SAGUN •MARGOSATUBIG •PITOGO •TABINA •Portion of AURORA, ZDS -Brgy. Lubid -Brgy. Lantungan -Brgy. Inroad -Brgy. Resthouse •Portion of the municipality of TUKURAN, ZDS -excluding brgys: x Navalan x Laperian x Buenasuerte x Sambulawan Reason/s of Interruption: *NGCP will conduct brief power interruption to facilitate load shifting from the 100MVA TBEA T2 to the 100 MVA ABB T3 & the 100 MVA ALSTOM T1 during the scheduled maintenance at Aurora Substation. As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption. Thank you.  
Published in Power Advisories