Thursday, 06 February 2025
NGCP SCHEDULE POWER INTERRUPTION
Date: FEBRUARY 8, 2025 (SATURDAY)
Time: 7:00 AM -7:30AM
Duration: 30 MINUTES
Affected area/s:
• UPPER BAYAO Substation
• TIGUMA Substation
• STA. MARIA Substation
• BALANGASAN Substation
• SAN MIGUEL Substation
Municipalities affected:
•PAGADIAN CITY
•LABANGAN
•DUMALINAO
•TIGBAO
•GUIPOS
•SAN PABLO
•SAN MIGUEL
•LAPUYAN
•DIMATALING
•DINAS
•VINCENZO SAGUN
•MARGOSATUBIG
•PITOGO
•TABINA
•Portion of AURORA, ZDS
-Brgy. Lubid
-Brgy. Lantungan
-Brgy. Inroad
-Brgy. Resthouse
•Portion of the municipality of TUKURAN, ZDS
-excluding brgys:
x Navalan
x Laperian
x Buenasuerte
x Sambulawan
Reason/s of Interruption:
1. NGCP will conduct brief interruption to facilitate load shifting from the 100MVA TBEA T2 to the 100MVA ABB T3 & the 100MVA ALSTOM T1 during the Re-Tapping of XLPE of Switchgear No.2 and the protection replacement to be conducted by MTD-A.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you.
Published in
Power Advisories