ZAMURECO-I Scheduled Power Interruption (April 19, 2023) between 9:00 AM - 5:00 PM
SCHEDULED POWER INTERRUPTION
Date: APRIL 19, 2023 (WEDNESDAY)
Time: 9:00 AM - 5:00 PM
Duration: 8 HOURS
Affected Area's:
PORTION OF MAHAYAG
• Brgy.San Vicente
• Brgy. Dalaguete
• Brgy. Delusom
• Brgy. Panagaan
• Brgy. Malubo
•Brgy. Tulan
PORTION OF JOSEFINA
• Brgy.Mansanas
• Brgy. Litapan
• Brgy. Nemeno
• Brgy. Tagaytay
• Brgy. Moradji
•Brgy. Dawa
• Brgy. Gumahan
•Brgy. Upper Bag-Ong Tudela
• Brgy. Leonardo
•Brgy. Nopulan
• Brgy. Sebokang
•Brgy. Bogo Calabat
PORTION OF MOLAVE
• Brgy. Bag-Ong Argao
• Brgy. Lower Dimorok
• Brgy. Upper Dimorok
• Brgy. Simata
• Brgy. Alicia
•Brgy. Silangit
• Brgy. Santo Rosario
•Brgy. Bag-ong Ariosa
• Brgy. Bag-Ong Gutlang
PORTION OF TAMBULIG
• Brgy. Maya-Maya
PORTION OF DON VICTORIANO
• Brgy. Lampasan
• Brgy. Tuno
• Brgy. Lalud
• Brgy. Napangan
• Brgy. Bag-ong Clarin
• Brgy. Petianan
• Brgy. Mara-mara
Reason/s of Interruption:
1. Line Conversion from VEE- Phase to Three Phase from Brgy. Delusom to Panagaan, Mahayag, ZDS.
2. Re-conductoring from #2/0 & #1/0 ACSR to #4/0 ACSR from brgy. Delusom to Panagaan, Mahayag ZDS.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you
Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160
Download attachments:
- IMG-431eb0c86260ac908bc4bf2ae51007bc-V.jpg (319 Downloads)