Scheduled Power Interruption (April 21, 2023) between 9:00 AM - 5:00 PM,
NGCP SCHEDULED POWER INTERRUPTION
Date: APRIL 21, 2023 (FRIDAY)
Time: 9:00 AM - 5:00 PM
Duration: 8 HOURS
Affected AREAS:
¤DANLUGAN FEEDER
Affected Barangays:
¤DAO (PRK. MAHAYAHAY AND FATIMA)
¤MANGA (VETALEA SUBDIVISION)
Reason of Interruption:
1.To facilitate the reconductoring of Single Phase Line from Bare Wire to Tree insulated Wire.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you
Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160
Download attachments:
- IMG-431eb0c86260ac908bc4bf2ae51007bc-V.jpg (327 Downloads)