Please bear with us. The site is still undergoing maintenance and enhancement procedures.

ZAMSURECO-I

Power Advisories

NGCP SCHEDULE POWER INTERRUPTION (NOVEMBER 24, 2023) between 6:00 AM TO 6:00 PM

NGCP SCHEDULE POWER INTERRUPTION Date: NOVEMBER 24, 2023 (FRIDAY) Time: 6:00 AM - 6:00PM Duration: 12 HOURS   Affected area/s: • UPPER BAYAO Substation • TIGUMA Substation • STA. MARIA Substation • BALANGASAN Substation • TIKWAS Substation • SAN MIGUEL Substation   Municipalities affected: •PAGADIAN CITY •LABANGAN •DUMALINAO •TIGBAO •GUIPOS •SAN PABLO •SAN MIGUEL •LAPUYAN •DIMATALING •DINAS •VINCENZO SAGUN •MARGOSATUBIG •PITOGO •TABINA •TUKURAN -excluding brgys: x Navalan x Laperian x Buenasuerte x Sambulawan •Portion of AURORA, ZDS -Brgy. Lubid -Brgy. Lantungan -Brgy. Inroad -Brgy. Resthouse   Reason/s of Interruption: 1. NGCP will facilitate the request of cooperative to ensure personnel safety during transformer delivery and placement at their Balangasan and Tiguma Substation.   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption. Thank you.

Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160