Sunday, 20 November 2022
SCHEDULED NGCP POWER INTERRUPTION UPDATE:
NGCP Revise Manual Load Dropping (MLD) Matrix Schedule for November 21, 2022 on Aurora-San Miguel 69kv Line
Time Schedule:
•8:01 AM - 10:00 AM
•1:01 PM - 3:00 PM
•5:01 PM - 8:00 PM
°10:01 PM - 12:00 AM
Affected area/s:
• UPPER BAYAO Substation
• TIGUMA Substation
• STA. MARIA Substation
• BALANGASAN Substation
• SAN MIGUEL Substation
Municipalities affected:
•PAGADIAN CITY
•LABANGAN
•DUMALINAO
•TIGBAO
•GUIPOS
•SAN PABLO
•SAN MIGUEL
•LAPUYAN
•DIMATALING
•DINAS
•VINCENZO SAGUN
•MARGOSATUBIG
•PITOGO
•TABINA
•Portion of AURORA, ZDS
-Brgy. Lubid
-Brgy. Lantungan
-Brgy. Inroad
-Brgy. Resthouse
•Portion of the municipality of TUKURAN, ZDS
-excluding brgys:
x Navalan
x Laperian
x Buenasuerte
x Sambulawan
NGCP will implement Manual Load Dropping (MLD) to all power customers of District 1, Mindanao O&M to temporarily limit power flow along Baloi-Aurora and Agus 5–Aurora 138kV lines to prevent breaching the safe clearance of the conductors from overgrown vegetation at Brgy. Tingin-tingin, Kauswagan, Lanao del Norte due to an uncooperative landowner refusing access to NGCP personnel to clear the vegetation.
NOTE: This is just temporary and will be changed once the NGCP transmission line is restored to its normal operating condition.
Thank you.
Published in
Power Advisories