Scheduled Power Interruption (May 6, 2023) between 3:00 AM - 6:00 AM,
SCHEDULED POWER INTERRUPTION
Date: MAY 6, 2023 (SATURDAY)
Time: 3:00 AM - 6:00 AM
Duration: 3 HOURS
Affected AREAS:
¤Portion of Pagadian City (Entire Brgy. Tulawas)
¤Portion of Tukuran (Entire Brgy. Upper Bayao
¤Municipality of Labangan, ZDS
Reason of Interruption:
1. To facilitate the Installation of Tapping of CITI Hardware.
As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.
Thank you
Warning: count(): Parameter must be an array or an object that implements Countable in /home/zamsureco1/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160
Download attachments:
- IMG-431eb0c86260ac908bc4bf2ae51007bc-V.jpg (336 Downloads)